① Core Role in Slaughter Line
Seamless Production Connection: Links pre-slaughter (stunning, bleeding) and post-hide-removal processes, ensuring smooth slaughter line operation.
Line Efficiency Booster: Fast, stable hide removal reduces bottlenecks, improving overall slaughter line throughput.
Strong Compatibility: Adaptable to different scales of slaughter lines, supporting customized integration with existing equipment.
Reliable Operation Guarantee: Industrial-grade design ensures long-term stable work, matching the high-demand operation of slaughter lines.
② Application Scenarios
As a key core equipment, it is exclusively used in industrial cattle slaughter processing lines. Suitable for large-scale slaughterhouses, professional livestock processing plants, and integrated meat processing enterprises with complete slaughter lines. It is an essential supporting component for building new slaughter lines or upgrading existing ones, effectively improving the automation and efficiency of the entire line.
③ Manufacturer's Services
Henger Manufacturing provides professional slaughter line overall solutions, including key equipment supply, customized integration design and after-sales support. Our services focus on slaughter line matching:
Slaughter Line Customized Matching: Design and supply equipment according to the overall layout and capacity of the slaughter line.
On-site Integration & Training: Professional team provides on-site installation, debugging and operator training for line integration.
Slaughter Line Upgrade Solutions: Offer equipment upgrading and line optimization advice to improve overall efficiency.
5. FAQ (Slaughter Line Integration Focus)
1. Q: Can this Cattle Hide Puller be integrated with different types of slaughter lines?
A: Yes. We provide customized integration solutions. Just share your slaughter line layout, production capacity and existing equipment parameters, and our team will match the suitable model and connection mode to ensure seamless integration.
2. Q: Do you provide technical support for the overall slaughter line integration?
A: Yes. We have professional engineers to provide one-stop technical support for slaughter line integration, including pre-design planning, on-site installation and debugging, and post-operation training, ensuring the stable operation of the entire line.
3. Q: What is the lead time for this equipment when matching a new slaughter line?
A: The lead time is usually 35-45 working days, which is synchronized with the overall progress of the slaughter line. We will arrange production and delivery according to the line construction schedule, and provide supporting logistics and export document services to ensure timely integration.